
Agm - Ash Utilization
4 days ago
Location: Angul (KL03AD01), IN- Company: GMR Kamalanga Energy Ltd.**JOB PURPOSE**:
Daily, Monthly and Yearly performance monitoring of the plant& its auxiliaries includes BTG, BOP, CHP and AHP along with preparation of the MIS regarding the Plant performance. MIS include Plant generation, Export, Coal and LDO/HFO oil consumption, Auxiliary Power consumption, Unit Heat rate. Conducting the Energy Audits for the entire plant and its auxiliaries. Along with the MIS to the management Analysis of critical events like preparation of the Event Analysis, Tripping analysis reports and their corrective and Preventive Maintenance actions. Implementation of the Integrated Management systems (IMS) includes ISO-9001/ 140001/180001/50001. Implementation of the OSI PI system
**ORGANISATION CHART**:
**KEY ACCOUNTABILITIES**:
**Accountabilities**
**Key Performance Indicators**
Plant Performance Analysis
- Heat rate
Reduction of Boiler and Turbine side Energy losses which can have significant impact on the Heat rate thereby reduction of the Fuel consumption and ultimately Savings in Fuel costs
Plant Performance Analysis
- APC
Reduction of Running hours and also the Optimization of the auxiliaries in BTG, BOP, AHP and CHP area there by reducing the Auxiliary power which can have significant impact on the Station Export thereby reduction of the Fuel consumption and ultimately Savings in Fuel costs
Energy Audits
Reduction of Energy losses through Energy audits there by reduction of the Fuel consumption and ultimately Savings in Fuel costs
Event Analysis& Tripping analysis
Root cause analysis of the Events and also the Tripping’s there by reduction of the recur of the same and also same type by taking Corrective and Preventive actions.
Implementation ISO-9001, 140001, 180001, 50001& OSI PI system
Implementation ISO systems so as to standardize the Plant operations includes Operation& Maintenance there by reduction of the minimum failures and optimize the operations and therefore improve the bottom line.
**EXTERNAL INTERACTIONS**:
**External - **Roles you need to interact with outside the organization to enable success in your day to day work
**Identification of the Best Practices adopted in the Power sector so as to optimize the Plant operations**
**To Bench mark Practices in Power industry to improve on the plant operations
**Energy Auditing organizations so as to conduct the Better way of Conducting the Audits**
**Co-ordination with the OSI PI (OSI Plant Information) team for implementing the OSI PI system in better way
**Contacting with the ISO auditors for Conducting the Pre-assessment audits, Certification Audits& surveillance audits**
**INTERNAL INTERACTIONS**:
**Internal - **Roles you need to interact with inside the organization to enable success in your day to day work
**Data/ Information Collection& Analysis of the Plant performance details from the All the departments including the Plant Operations and Maintenance departments includes Electrical, Mechanical and Control& instrumentation**
**Data/ Information Collection& Analysis of the Event& Tripping occurred so as to prevent the same from recur includes the Plant Operations and Maintenance departments includes Electrical, Mechanical and Control& instrumentation**
**To conduct the ISO (International Organization for Standardization) internal audits and Surveillance audits.**
**To Conduct the Performance tests and also Energy Audits**
**Adoption of the new system like VFD (Variable Frequency drives) in the plant**
**FINANCIAL DIMENSIONS**:
- Reduction in 1 Kcal of Unit heat rate reduces the fuel cost by Rs 29 Lac/ Annum
- Reduction in one unit Tripping (With warm start up) can save Rs 1crore
**OTHER DIMENSIONS**:
- During the Erection& Commissioning of the power plant handled more than 20 to 25 engineers and 30 Technicians
**EDUCATION QUALIFICATIONS**:
- B.Tech from National Institute of Technology
- Warangal
- Telangana.
- Certified Six
- Sigma Green belt
- Certified Lead Auditor
- ISO
**RELEVANT EXPERIENCE**:
- Power plant Operations: 3 Years
- Power Plant Commissioning, Operation& Efficiency: 5 Years
- Power Plant Erection, Commissioning: 1 Years
- Power Plant operations& Efficiency: 2 Years
**COMPETENCIES**:
- Managing Performance: Effectively monitors and measures performance. Develops people and drive results. | Interview
- Innovation
- Managing Change and ambiguity by creating Win-Win
- Determination(Contextual and Flexible)
- Learning Ability
- Making & Navigating proposals
- Scanning, Networking & External orientation
- Maintenance Management
- Operations Management
- Execution and Operational Excellence: Ability and desire to execute with attention to detail, speed, accuracy and consistency | Interview
- Team Leadership, Teamwork & Interpersonal Influence: Capability to develop & converge individual potential to execute team objectives. Effectively intermingle and relate with individuals in a positive manner. | Interview
- Pro
-
Agm - Ash Utilization
4 days ago
India GMR Infrastructure Full timeLocation: Warora, IN- Company: GMR Enterprises Pvt Ltd**JOB PURPOSE**: Strategize, develop and establish sustainable ash utilization activity complying with the statutory authority in cost effective manner. **ORGANISATION CHART**: COO - GWEL Head - TS AGM - Ash Management **KEY ACCOUNTABILITIES**: - Long term Utilization/ Disposal of Ash: - Develop...
-
Agm-airside Planning
2 weeks ago
India GMR Infrastructure Full timeLocation: Hyderabad, IN- Company: GMR Hyderabad Intl Arprt**JOB PURPOSE**: To plan, coordinate, supervise and exercise all due diligence in the implementation of works on Airside during Phase 3A expansion including but not limited to facilitating tasks, HOTO of work areas, implementation of safety recommendations, hazard identification and reporting,...
-
AGM - Tool Based Optimization
16 hours ago
Indore, India Vodafoneidea Full timeJob Description Vodafone Idea Limited is an Aditya Birla Group and Vodafone Group partnership. It is India's leading telecom service provider. The Company provides pan India Voice and Data services across 2G, 3G and 4G platform. With the large spectrum portfolio to support the growing demand for data and voice, the company is committed to deliver delightful...
-
▷ [Urgent] AGM - Zonal Technical Manager
16 hours ago
Hyderabad, India Vodafoneidea Full timeJob Description Vodafone Idea Limited is an Aditya Birla Group and Vodafone Group partnership. It is India's leading telecom service provider. The Company provides pan India Voice and Data services across 2G, 3G and 4G platform. With the large spectrum portfolio to support the growing demand for data and voice, the company is committed to deliver delightful...
-
Operations Lead – Biochar Projects
2 weeks ago
India Varaha ClimateAg Private Limited Full time US$ 1,20,000 - US$ 2,00,000 per yearWe are seeking an experienced and technically strong Operations Lead for Biochar Projects to lead the setup, commissioning, and management of industrial-scale biochar production units. The role will require deep technical knowledge of pyrolysis/gasification systems, plant engineering, thermal energy systems, and operational best practices to ensure...