Quantity Surveyor

5 days ago


Ranchi Jharkhand, India Perfect Engineers and Consultant Full time

BOQ AND BOM PREPARE
- MATERIAL RECONCILIATION
- FIND QUANTITES
- HIGHWAY ROAD EXPERIENCE IS MUST

**Job Types**: Full-time, Permanent

Pay: ₹20,551.95 - ₹30,000.00 per month

Schedule:

- Day shift

**Experience**:

- total work: 1 year (required)

Work Location: In person


  • Quantity Surveyor

    5 days ago


    Ranchi, Jharkhand, India DCS Jobs Solution Full time

    Construction Industry Profile - Quantity Surveyor Qualification - BE / B.TECH - CIVIL Salary - Upto 3.6 lac Experience - Min. 3+ yrs. in Road & Bridges Project Location - Ranchi Expected Joining : 15 days A Quantity Surveyor (QS) with experience in road and bridge projects plays a vital role in managing all aspects of the financial and contractual...


  • Ranchi, Jharkhand, India Godawari Harsh Construction Full time

    **Assistant Quantity Surveyor (AQS)** Godawari Harsh Construction, Pvt Ltd. Ranchi / M/S Dilip Kumar, Ranchi is seeking to hire an experienced Asstt. Quantity Surveyor. Who must have B.E./ B.Tech In Civil Engineering to qualify for the above Post. He must have idea of Rate Analysis, Cost assessment of Materials, Machineries, Man Power based on Stale /...


  • Ranchi, Jharkhand, India Godawari Harsh Construction Full time

    Godawari Harsh Construction, Pvt Ltd. Ranchi / M/S Dilip Kumar, Ranchi is seeking to hire an experienced Asstt. Quantity Surveyor. Who must have B.E./ B.Tech In Civil Engineering to qualify for the above Post. He must have idea of Rate Analysis, Cost assessment of Materials, Machineries, Man Power based on Stale / Central Schedule of Rates (SSOR/CSOR),...


  • Ranchi, Jharkhand, India 30c8e396-0d33-4b05-94df-ecdcb1af1f49 Full time ₹ 3,60,000 - ₹ 4,20,000 per year

    Godawari Harsh Construction, Pvt Ltd. Ranchi / M/S Dilip Kumar, Ranchi is seeking to hire an experienced Asstt. Quantity Surveyor. Who must have B.E./ B.Tech In Civil Engineering to qualify for the above Post. He must have idea of Rate Analysis, Cost assessment of Materials, Machineries, Man Power based on Stale / Central Schedule of Rates (SSOR/CSOR),...