
Product & UX Director, Operations
3 days ago
Solberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. We’re installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov’2025. The Operations Head – Production will be responsible for end-to-end management of solar module production operations, ensuring targets are met with high efficiency, low scrap, and strict adherence to safety and quality. This role demands strong leadership in managing multi-shift operations, optimizing throughput, and preparing the production team for capacity expansion.
Lead day-to-day planning, scheduling and operations of solar module lines (stringers, layup, laminators, EL/IV testers, Hi-Pot testers, framing & packing lines).
~ Manpower & Shift Planning
Manage and mentor a team of shift supervisors and operators (150+ workforce).
Develop manpower deployment models for current capacity and Phase-2 expansion.
Build skill matrices, conduct training, and promote a culture of accountability.
Quality & Compliance
Ensure strict compliance with cleanroom protocols (dust, humidity, temperature).
Collaborate with Quality team to achieve first-pass yield and zero-defect delivery.
Work closely with Maintenance, Quality, SCM, and EHS teams for smooth line operations.
Provide data-driven reports to Plant Head / President- Operations on production KPIs.
B.E./B.Tech in Mechanical / Electrical / Production Engineering.
~10–15 years of experience in high-volume manufacturing, with at least 5 years in a leadership role.
~ Minimum 5 years of experience in solar module preferred along with continuous/discrete manufacturing.
~ Strong background in production planning, line balancing, and lean systems.
Production planning & execution.
Data-driven mindset (ERP/MES systems).
Focus on quality, safety, and compliance.
Pay range and compensation package
-
Product & UX Director, Operations
1 week ago
Kadi, Gujarat, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – Production Solberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. We're installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov'2025. The Operations Head – Production will be responsible for end-to-end management of solar module production operations, ensuring targets are met...
-
Production Operations Director
1 week ago
Kadi, Gujarat, India beBeeOperations Full time ₹ 3,50,00,000 - ₹ 4,75,00,000Job Title: Operations Head - ProductionSolberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up with an 800 MW Topcon line to reach a total capacity of 900 MW.About the RoleThe Operations Head – Production will be responsible for end-to-end management of solar module production operations, ensuring targets are met with high...
-
Solar Module Production Manager
1 week ago
Kadi, Gujarat, India beBeeproduction Full time ₹ 20,00,000 - ₹ 25,00,000We are seeking a highly experienced Production Operations Director to join our team. The ideal candidate will have a strong background in high-volume manufacturing, with at least 5 years of experience in a leadership role."],
-
Production Operator
4 days ago
Kadi, India RS CONSULTANTS Full time**We are hiring Production Operator for an MNC** **Direct transport from Ahmedabad** **Job Purpose**: - To work as per standard operating procedures as shown in work instruction & operate machine considering optimum utilization, resource saving & all the aspect of safety. - To produce product as per quality requirements to meet customer requirement. - To...
-
Head of Product Operations
2 days ago
Kadi, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – Production About the Company Solberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up. We’re installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov’2025. In Phase-II, we plan to ramp up further to reach a total of 1.7 GW installed capacity. About the...
-
Head of Product Operations
3 days ago
Kadi, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – ProductionAbout the CompanySolberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up. We’re installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov’2025. In Phase-II, we plan to ramp up further to reach a total of 1.7 GW installed capacity.About the...
-
Head of Product Operations
4 days ago
Kadi, Gujarat, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – ProductionAbout the CompanySolberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up. We're installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov'2025. In Phase-II, we plan to ramp up further to reach a total of 1.7 GW installed capacity.About the RoleThe...
-
Head of Product Operations
2 weeks ago
Kadi, Gujarat, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – ProductionAbout the CompanySolberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up. We're installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov'2025. In Phase-II, we plan to ramp up further to reach a total of 1.7 GW installed capacity.About the RoleThe...
-
Head of Product Operations
7 days ago
Kadi, Gujarat, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – Production About the Company Solberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up. We're installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov'2025. In Phase-II, we plan to ramp up further to reach a total of 1.7 GW installed capacity. About the Role...
-
Head of Product Operations
2 weeks ago
Kadi, Gujarat, India Solberry Energy Pvt. Ltd. Full timeJob Title: Operations Head – ProductionAbout the CompanySolberry Energy Pvt. Limited, a subsidiary of InSolare Energy Pvt. Limited, is scaling up. We're installing an 800 MW Topcon line (Project Phase-I) to have a total capacity of 900 MW by Nov'2025. In Phase-II, we plan to ramp up further to reach a total of 1.7 GW installed capacity.About the RoleThe...