Staff Tpp

2 months ago


Karnataka, India Aditya Birla Group Full time

**Designation**:Assistant Engineer

**Updated**:July 03, 2023

**Location**:Karnataka, India

**Organization**:Cement

Maintenance of equipment’s of 2X25 MW coal based Power plant. To plan and execute various types of maintenance activities for mechanical equipment’s at TPP specially for Boiler, ID PA SA Fans, Drag Chain Feeder, MDC, APH, Shuttle conveyor, IBR valves, Safety Valves, Main steam stop valves, Emergency relief valves, Motorized valves, ESP, Bag filters, Diesel pumps, Oil firing system, Dampers, Spring hanger supports, U beam, Pressure parts, Coal feeding system, RAV, Blasters, KGV and Gear Box.
- KRA 1: Availability of Thermal Power Plant RC4 TPP by 100%. To increase MTBF and to reduce MTTR of Boiler

& ESP. Target of Zero breakdown of equipment. Annual Shut down planning and execution as per schedule.
- KRA 2: To participate for achieving KPIs / QCDIP as per unit targets, implementing criteria’s of various KFA at GRT
- kaizen, abnormality, suggestions, model area, 5s mega cleaning, audits, etc. To maintain ISO documentations

and fulfil requirements within section. To implement SAP systems at unit for respective area - why why,

abnormalities, data entry, PM checks, etc. Utilization PMI by 100%.
- KRA 3: To assist in implementation of Work at Height and Work at Hot work activities at unit as per action plan.

Safety systems implementation at unit.
- KRA 4: Strategic Projects

1) Boiler 4&5 Fan bearing replacement work

2) Boiler 04 MDC mat replacement work

3) Bed ash cooler expansion below replacement work

4) DCF 45&6 sprocket and chain replacement work
- KRA 5: Performance and Talent Management Utilization of On line PTW system Utilization of MySetu for walk through and NMC submission Utilization of SAP for Material issue, PM compliance etc. Boiler Steam Drum manhole door overhauling work Boiler 4&5 Furnace door overhauling work Daily Check list of TPP Equipment and Lubrication monitoring.

Professional Qualifications: ITI Fitter

Essential: Experience in CFBC Boiler, Coal Handling plant.

Preferably: ITI Fitter with 8 to 10 Yrs. of experience

**Qualifications**:
ITI,Diploma,Under Graduate

**Minimum Experience Level**:
8-10 Years

**Report to**:
Trainee


  • Staff Tpp

    2 months ago


    Karnataka, India Aditya Birla Group Full time

    **Designation**:Assistant Officer **Updated**:November 15, 2023 **Location**:Karnataka, India **Organization**:Cement **Professional Qualifications: ITI Welder with IBR certification** **Essential: Experience in CFBC Boiler maintenance work with IBR welder certification.** **Preferably: ITI Welder (With IBR certification) with 8 to 10 Yrs of...

  • Staff Tpp

    2 months ago


    Karnataka, India Aditya Birla Group Full time

    **Designation**:Senior Supervisor **Updated**:May 02, 2024 **Location**:Karnataka, India **Organization**:Cement Professional Experience description: - To handle maintenance of TG’s, DG and Solar in co-ordination with TPP operation team. Continuously strive to achieve highest efficiency, availability and lowest auxiliary power consumption. - He should...

  • Staff Tpp

    4 days ago


    Karnataka, India Aditya Birla Group Full time

    **Designation**:Senior Supervisor **Updated**:May 02, 2024 **Location**:Karnataka, India **Organization**:Cement Professional Experience description: - To handle maintenance of TG’s, DG and Solar in co-ordination with TPP operation team. Continuously strive to achieve highest efficiency, availability and lowest auxiliary power consumption. - He should...

  • Staff Tpp

    4 weeks ago


    Karnataka, India Aditya Birla Group Full time

    **Designation**:Assistant Officer **Updated**:November 21, 2023 **Location**:Karnataka, India **Organization**:Cement Professional Experience description: Minimum 8 year experience in power plant maintenance **Critical Job competencies / Mandatory Skills**: 1. Maintenance skill in pumps ,oil pum Gearbox ,mechanical seal ,boiler pressure parts 2. Hands...