Boiler First Class
1 month ago
Kadi, India
Gujarat Ambuja Exports Limited
Full time
Minimum 5 yrs working Experience in Power plant, AFBC water tube High Pressure 66Kg/Cm2, 500 Deg C Temperature boiler & Extraction Cum Condensing turbine With DCS system
1 S.S.C. G.S.E.B
2 H.S.C. G..H.S.E.B.
3 I.T.I.(Fitter) N.C.V.T.
4 Apprenticeship N.C.T.V.T.
6 Second Class Boiler Operator. N.C.V.T.
7 First Class Boiler Operator N.C.V.T./Diploma
8 Diploma in Mechanical T.E.B