PF Instrument

3 weeks ago


Patna, India Aditya Birla Group Full time

Key Result Areas

Supporting Actions

Plant Availability

Support to SH in Ensuring its effective implementation to reduce stoppages of VRM, Bag house, Elevators belt conveyors up to silo feeding,Hopper extraction ,Hopper feeding from stacker reclaimer and wagon

shift operation of Ball Mill RP Circuit, Both Slag Mills, Complete VRM Circuit, Utility and Fly Ash Handling, Packing Plant, Wagon Tippler & Wagon Loading,VRM, Coal Mill, Stacker-Reclaimer ,Belt conveyors,Bucket elevators,Fly ash silo equipments,Cement silo feeding equipments,Bag house,HAG,Weigh feeders,Rotary feeders,Air slide blowers ,Transformers,Switch yard,Rotopacker,Truck loading Machine,Wagon loading machine, 

* Reducing down time by timely respons to control room, motivating & practicing kaizen and innovative activities in the dept, 
* Awarding annual maintenance contract to OEM for specific equipments in order to maintain equipment efficiency / reliability, 
 * Insuring stable power supply by regulating incoming power supply and avoiding false tripping in electrical system through reliable maintenance and protection system.

Cost Control

Eliminating production losses by reducing equipment breakdowns and nuisance plant tripping, Upgrading critical equipments / spare parts for better performance and higher reliability, 
* Power saving through process optimization and equipment interlocking, monitoring, start / stop time& new innovation.
* Avoiding idle running of plant equipments, lightening system, utilities through better energy monitoring system etc, control on inventery & reduce S&S. 
 * Incorporating modification in equipment(s) / processes in order to increase equipment and process efficiency.

Technological Improvements

Study of processes and identifying area of opportunity for technological adoption or up gradation in the plant, 
* Study of new technology and its benefit over existing system, cost benefit analysis and life cycle costing of technology and collection of performance feedback from group units and other competitors, 
 * Material indenting, procurement, implementation plans, erection and commissioning,

Statutory compliance:
Ensure the compliance of all statutory requirements.

Timely input for preparation of reports.
¿ Forwarding the reports to Government agencies.
¿ Coordinate with authorities during their visit for inspection.
¿ Mobilise resources for statutory compliance.
¿ Compliance of observance.
¿ Maintaining the electrical installation as per statutory norms.
¿ Maintain statutory records.


  • PF Instrument

    5 days ago


    Patna, Bihar, India Aditya Birla Group Full time

    Key Result Areas Supporting Actions Plant Availability Support to SH in Ensuring its effective implementation to reduce stoppages of VRM, Bag house, Elevators belt conveyors up to silo feeding,Hopper extraction ,Hopper feeding from stacker reclaimer and wagon shift operation of Ball Mill RP Circuit, Both Slag Mills, Complete VRM Circuit, Utility and...

  • PF Instrument

    2 months ago


    Patna, India Aditya Birla Group Full time

    Planning, organizing, coordinating, monitoring and controlling all Electrical & Instrumentation functions in order to maximize Plant Availability, Ensuring good quality of Plant Maintenance, Safe and Proper Distribution of Electric Power, Section wise power monitoring, its analysis and feedback report to SH E&I Maintenance He is also responsible to identify...

  • PF Instrument

    3 weeks ago


    patna, India Aditya Birla Group Full time

    Key Result Areas Supporting Actions Plant Availability Support to SH in Ensuring its effective implementation to reduce stoppages of VRM, Bag house, Elevators belt conveyors up to silo feeding,Hopper extraction ,Hopper feeding from stacker reclaimer and wagon shift operation of Ball Mill RP Circuit, Both Slag Mills, Complete VRM Circuit,...