CMPC Cell

2 weeks ago


Dahej, Gujarat, India LT-Larsen & Toubro Limited Full time ₹ 40,00,000 - ₹ 1,00,00,000 per year

PLANNING:

  • Study the drawings, technical specifications & understand the total scope of formwork.
  • Coordination with Clients/Consultants/ Designer based on requirement if any to change the drawings or specs.
  • Prepare the formwork strategy along with the Site Civil head & Site Planning for the job.
  • In line with the base schedule & formwork strategy, prepare the planning for Resources, Material, and Tools & Tackles for execution.
  • Coordinate with other depts. like Planning, Quality, P&M and In-charges and ensure that all construction methodology is in place as a team.
  • Monitor & track the weekly/monthly material stock and update the same to Head office for any discrepancies or requirements not met as per schedule.
  • Monitor & update the Formwork Performance Report to Head office monthly.

EXECUTION:

  • Ensure that the carpentry workshop is set-up as per norms and fully functional to carry out the formwork making activities for site execution.
  • Ensure that the formwork yard is identified and set-up as per the space available at site to properly stack all formwork materials received into the site.
  • Prepare a mock-up facility displaying the available formwork systems for training purposes.
  • Assist the formwork foremen & chargehands in understanding the formwork scheme drawings if any difficulties arise for necessary implementation.
  • Conduct periodical checks when formwork is in progress and ensure that all design criteria and scheme drawings criteria are met.
  • Inspect the formwork for necessary safety & quality checks before & after concreting.
  • Record any incidents related to formwork and ensure it is avoided in future by taking appropriate action and circulate the same across the IC for awareness.
  • Ensure that the training is conducted for all workmen at regular intervals at site and mock-up areas to improve the productivity levels.

  • Cmpc Cell

    1 week ago


    Dahej, India Larsen & Toubro Full time

    CMPC Cell LNT/FE/1416243 HYDR-L&T Energy - HydrocarbonDahej, Gujarat - Posted On - 18 Jul 2025 - End Date - 14 Jan 2026 - Required Experience - 5 - 10 Years **Skills**: Knowledge & Posting Location - PLANNING EXECUTION - EXECUTION SKILLS - CONSTRUCTION MANAGEMENT - FORMWORK Minimum Qualification GRADUATE IN CIVIL ENGINEERING **Job...