Shift in Charge

3 days ago


Kharagpur, India Talent Leads HR Solutions Full time

Opening: 1 Nos.
- Job ID: 61446
- Employment Type: Full Time
- Reference:

- Work Experience: 3.0 Year(s) To 10.0 Year(s)
- CTC Salary: 4.00 LPA TO 5.00 LPA
- Function: Production / Maintenance / Quality
- Industry: Plastic/Rubber
- Qualification: B.Tech/B.E. - Other Engineering; Diploma - Engineering
- Location:

- Kharagpur
**JOB DESCRIPTION: SHIFT ENGINEER CAPCELL PLANT**

**Job Responsibility**

1 To ensure productivity as per target.
- To ensure production as per planning and given target
- To keep the wastage within the targeted limits
- To reduce scrap generation by implementing KAIZEN

2 To keep all equipment's healthy and productive.
- To send daily reports on condition monitoring as per prescribed ISO formats to Maintenance dept.

3 To practice required safety norms within the Manufacturing activities all the time without compromise.
- To check if m/c emergency switches are working properly or not
- To ensure that gangway is clear of any material
- To ensure that fire extinguishers are in working condition and kept at proper place.
- To ensure that safety guard/switches are available wherever required.
- To ensure that no employee/casual is talking on mobile in the production area.
- To ensure accident free shift
- To ensure that person in Chemical Room is wearing Safety Glasses, Mask, Gloves & Aprin while working
- To ensure that person on kneader is wearing Mask & Hand gloves while working.
- To ensure that nobody in the plant enters without wearing shoes.
- To ensure that person on Press is wearing Hand gloves while working.

4 To maintain quality of the product within declared norms.
- To ensure production of the material as per prescribed norms of density, hardness, thickness and size.
- To ensure the product dimensions as per customer requirement.

5 To keep continuous focus on 4M and upgrade.

a Manpower
- i To ensure the optimum utilization of manpower and any unnecessary deployment of CL should be avoided.
- ii To verify CL attendance on daily basis and submit to HR on daily basis.
- iii To ensure that no operator/CL is idle in the shift.
- iv To maintain discipline among the Operators/CLs that they are not leaving the plant unnecessarily for Toilets/Drinking water excuses.
- v To ensure that CL/Operators are coming and leaving the plant as per their shift timings, any discrepancy should be immediately reported to HR and strict action should be taken.
- vi To ensure that CLs/Operators are going for lunch as per scheduled time and return back in 30 mins.

b Machine
- i To ensure that the preventive maintenance of machines is carried out as per plan.
- ii To inform the HOD regarding any predictive maintenance of the m/c.
- iii To ensure that the maintenance persons are fulfilling their daily machine checking compliance.
- iv To ensure neatness and cleanliness of the machines and paint work as and when required.

c Material
- i To fill up daily RM Reco report without fail and report it to HOD.
- ii To ensure that the RM & SFG/FG are kept at the designated area within the yellow marking.
- iii To ensure safe upkeep of RM & SFG/FG and to keep the material only on pallets.
- iv To ensure that RM is handeled with care and transferred on trolleys in order to avoid any sweepage of material.
- v Daily physical stock to be reported to HOD in the WIP format.
- vi To ensure proper stacking of Buns as per their grade and size in the designated area.
- vii To ensure that FG is transferred on trolleys only.

d Method
- i To maintain all process parameter records of every machine.
- ii To maintain log-book on daily basis and ensure that all the entries are correct.
- iii To prepare shift production report and submit to MIS dept on daily basis by 10 AM.
- iv To monitor all the activities related to stock, transfer, packing etc.and ensure that all the activities are reported through prescribed slips.
- v To display all the SOPs related to m/c operation, product specification, safety in the plant
- vi To ensure that the Job card of every machine is displayed on it.

9 To ensure realtime entries in SAP
10 To ensure proper housekeeping in the plant by implementing 3S.
- i To ensure area allocation for every thing in the plant and all the things are kept at their allocated area.

**KEY RESULT AREAS**

1 Minimize the wastage%
2 No. of Accidents
3 Absentisum
4 Minimize & monitoring idle hours during shifts
5 ISO Implementation
6 5s Implementation

**Key Skills**:

- Cipet
- Production Engineering
- Plastic
- Rubber