Formwork

2 weeks ago


Assam, India Larsen & Toubro Limited Full time

Experience: 3 to 18 Years. Full Time Graduate or Diploma Engineers or ITI having substantial e xperience in the building construction.
- Study of drawings, technical specifications & understand the total scope of formwork.
- Coordination with Clients/Consultants/ Designer based on requirement if any to change the drawings or specs.
- Prepare the formwork strategy along with the BSCC Cluster Incharge& Site Planning for the job.
- In line with the base schedule & formwork strategy, prepare the planning for Resources, Material, and Tools &Tackles forexecution.
- Coordinate with other depts. like CMPC, P&M and Tower/Section in-charges and ensure that all construction methodology is in place as a team.
- Monitor & Track the weekly/monthly material stock and update the same to Cluster BSCC Incharge and HQ for any discrepancies or requirements not met as per schedule.
- Monitor & update the Formwork Performance Report to Cluster BSCC Incharge on a monthly basis.

**EXECUTION**:

- Ensure that the carpentry workshop is set-up as per norms and fully functional to carry out the formwork making activities for site execution.
- Ensure that the formwork yard is identified and set-up as per the space available at site to properly stack all formwork materials received into the site.
- Ensure that no formwork material is issued to the labour sub-contractors from store / formwork yard without site formwork in-charge’s approval on the indent.
- Prepare a mock-up facility displaying the available formwork systems for training purpose.
- Ensure the house-keeping at yard and site is done at regular intervals and area of work is maintained neat and clean.
- Assist the formwork foremen &chargehands in understanding the formwork scheme drawings if any difficulties arise for necessary implementation.
- Conduct periodical checks when formwork is in progress and ensure that all design criteria and scheme drawings criteria are met.
- Inspect the formwork for necessary safety & quality checks before & after concreting.
- Record any incidents related to formwork and ensure it is avoided in future by taking appropriate action and also circulate the same across the IC for awareness.
- Ensure that the checklist is maintained and report made for every zone before & after concreting.
- Coordinate with HQ, for technical support required if any for implementation.
- Ensure that the training is conducted for all workmen at regular intervals at site and mock-up areas to improve the productivity levels.
- Training for formwork foremen &chargehands whenever new system implementation should take place without fail and ensure it is reinforced by having periodical reviews.

Ensure that 100% reconciliation of formwork items happen once in every 6 months and report the same to cluster & HQ.