Pf Instrumentation

1 week ago


West Bengal, India Aditya Birla Group Full time

**Designation**:Assistant Manager

**Updated**:November 07, 2024

**Location**:West Bengal, India

**Organization**:Cement

**Job Purpose**:
Power consumption of Cement Grinding (Including Misc Power) : 30.75, Achieving business volume as per budget 90%, Completion of sanctioned CAPEX Jobs by February'21, Mill unplanned stoppage: target-34 hr (Improve 20% in previous year), Availability of X-ray analyses and QCX: 99% and Compliance to PM KPIs

**Job Context & Major Challenges**:
Job Context: West Bengal Cement Works is situated at Durgapur, having the production capacity of 1.4 MTPA. It was established in January 2002 as L&T Cement Ltd. (WBCW) and acquired by Grasim Cement in 2004 and subsequently rebranded as Ultratech Cement Ltd. Raw materials like fly-ash and Slag are sourced from nearby power and steel plants. All products including recent launches like PCC are well accepted in the market. WBCW has one of the lowest manufacturing cost amongst the group units. Present capacity of Packing plant is well equipped to handle 1.5 million ton per year. Logistically plant is well connected by road and rail. Other stengths include good availability of power, Outsourced Contract Workmen, 100% Safety and Statutory Compliances maintained apart from dedicated transporter fleet.

Milestones:
? It achieved 1st time 1 MTPA in 2009
? State level Environment Excellence Award 2007
? Greentech Award 2010
? PCC introduced in 2018
Major Challenges:
1. Power consumption of Cement Grinding (Including Misc Power) : 30.75
2. Achieving business volume as per budget 90%
3. Completion of sanctioned CAPEX Jobs.
4. Mill unplanned stoppage: target-34 hr.
5. Availability of X-ray analyses and QCX: 99%
6. Compliance to PM KPIs
7. To Ensure Zero Fatality & Zero LTI against Work at height, Electrical Safety & CS, Vehicle movement related activities

**Key Result Areas**:
**KRA (Accountabilities) (Max 1325 Characters)**

**Supporting Actions (Max 1325 Characters)**
- KRA1- Cost of naked cement without Clinker
Power consumption of Cement Grinding (Including Misc Power) : 30.75
Improvement project / Emission control at ESP
Achieving business volume as per budget 90%
Completion of sanctioned CAPEX Jobs by February'21
Enhanced the knowledge of project and team learning skill.
To Ensure Zero Fatality & Zero LTI against Work at height, Electrical Safety & CS, Vehicle movement related activities.DFP- Reduction in S&S for consumables based on zero based budgeting and RPM: Within Budget
Maintenance of reactor power factor; ReduceBD
Increase automation for reduction of manual activities & operational excellence: :1 Improvement project / reduction in dust emission level
Stress on all parameters to achieve business volumes
Meet timeline & deadline
Continuous project and team learnings
Carry out Job Cycle Checks (JCC) as per schedule- KRA2- 20% Reduction in TRIR (0.75 in FY 19-20)-DFP
100% Compliance to COVID precaution SOP in respective area/site.DFP- 100% compliance of safety standards, recommendations of Black/Red corner notices, Incident investigations
Ensure 100% manpower is trained for given job and participated in tool box talk
Ensure 100% compliance to PTW/SWP before starting the work
Gap identified and rectified against safety standards to achieve 100% compliance
Involvement in safety improvement at site location through GRT.- KRA3- Mill unplanned stoppage: target-34 hr (Improve 20% in previous year)
Availability of X-ray analyses and QCX: 99%
Compliance to PM KPIs- Continuous Monitoring & preventive maintenance, spare planning

PM Checks, Why Why analysis, Cost booking through PM Orders & R1,R2,S1,S2 check list compliances with zero slippage by 90%.
basic condition of equipment to be improved based on BCE audit guidelines (BCE,5S, Kaizen, housekeeping)by 75%
Cost booking through PM Orders & R1,R2,S1,S2 check list compliances with zero slippage)by 90%**Qualifications**:
Diploma,DXPF3.Bachelor of Engineering,Bachelor Of Technology

**Minimum Experience Level**:
5-8 Years

**Report to**:
Senior Manager



  • Topsia, Kolkata, West Bengal, India GLOBAL WRITINGS (SUPRA PENS) Full time

    **Opening For MIS Executive** Supra Pens is a leading manufacturer in the writing instrument industry, celebrated for our dedication to quality, innovation, and customer satisfaction. With a rich history of excellence, we continue to grow and expand our product offerings, serving customers globally. **Responsibilities**: - Develop and maintain databases...

  • CNC Milling Operator

    5 months ago


    Howrah Maidan, Kolkata, West Bengal, India Auto Design System Full time

    **Organization**: - Auto Design System **Job Title - **CNC Milling Operator **Salary Range-** Up to ₹ 15,000 per month **Location**: - Howrah, West Bengal **Basic Qualification required-** **JOB RESPONSIBILITIES**: - Set up and operate CNC milling machines to produce precision parts as per engineering drawings and specifications. - Select and...