Surveyor (Api)
5 months ago
**Ø** Purpose of Position**
- The job incumbent is responsible for inspection in QA/QC field of IND business (Oil & Gas, Power and Petrochemical Industries).
- The position performs in line with the Bureau Veritas Quality Assurance System, including the BV Code of Ethics and the BV Group policy
**Ø** Major Responsibilities**
- Inspection of Pressure Vessels & components: (Filters, Boilers, Storage Tanks etc) from raw material stage to final stage, as per different codes & standards like ASME Sec-VIII. Including Documents review like QAP, WPS, PQR, WPQR, material identification, applicable testing, stage-wise inspection of welding & fabrication like joint fit-up, welding inspection, NDT, components inspection, final inspection like leakage testing by hydraulic & pneumatic means etc.
- Inspection of Piping: Piping inspection for Process plant, including activities like stage-wise inspection, components inspection, Dimensional, Spool inspection at fabricator’s site.
- Inspection of Pipes & Tubes: Inspection of ERW & SS pipes as per ASTM, IS and API standards. Including Raw-material stage to Final inspection i.e. review of documents, witness of strip & pipe U.T., Eddy-current testing, MPT, Hydro-test, mechanical test & other test requirements for black as well as galvanized pipes. Handled many projects of pipes inspection as per different grades.
- Inspection of piping components like Flanges, Fittings, Valves, Pumps including various testing activities as per applicable piping code & product standard.
- Inspection of Castings: Inspection of Critical jobs like Shafts & Roller assemblies, Gears, Mill Heads, with activities like Raw Material Identification, Applicable physical & chemical Testing, U.T. in proof machined condition, final inspection after machining, M.P.I., D.P.T.
- Inspection of Steel structure for hydro power plants: Inspection of structural parts of hydropower projects like radial gates, spillway stop logs, surge shaft, trash racks etc M.P.I., D.P.T., and UT of parts. Also includes inspection of other structural parts like structural steel section, trusses, and towers.
- Vendor Assessment: An audit activity on documentation & different aspects of quality control & quality assurance at vendor’s site, analysis of system of NC follow ups & effectiveness of implementation of QMS, product testing. Subsequent Vendor Rating on the basis of observations. Capacity assessment of manufacturing facilities of manufacturers for various clients.
- Project coordination & management:
- Preparation & implementation of inspection checklists.
- Project coordination & management for inspection of bought out items and site inspections for various
- Project coordination for fabricated structural parts
**Ø** Criteria for Performance Evaluation (KPIs)**
- Time taken to deliver the report to the client
- Quality of report
- Inspection done in the allocated timeframe
- Client claims
- Detention ratio
- Customer satisfaction
- Share information, Best practice, Knowledge Management
- Quality of Work
- Number of surveys / inspections
- Compliance of internal and external guidelines, policies, procedures.
- Adherence to environmental and safety policies of our organization