PF TPP

3 weeks ago


India Ultratech Cement Limited Full time


JOB PROFILE -
  1. To operate the Captive Power Plant 2 .25 MW efficiently.
  2. Control desk Operation of Boilers, Turbines, BOP & Coal handling plant.
  3. To ensure compliance of all Reliability, quality, safety, & Environment parameters and statutory compliances through strict monitoring of operations.


KRA 1: Efficient Power Plant Operation
1.Uninterrupted power supply to cement plant.
2. Zero Breakdowns & Zero Tripping's
3. Availability of Thermal Power Plant RC4 TPP by 100%.

KRA 2: Participant in team strategic projectsParticipant in team strategic projects
Reduction of Auxiliary Power %
Reduction of Plant Heat rate
UFR Utilization

KRA 3: Cost control & best utilisationsCost control & best utilisations
1. Reduction Auxiliary Power%
2. Deduction of Plant Heat rate
3. Reduced steam and feed water losses
KRA 4: WCM
  1. To participate for achieving KPIs / QCDIP as per unit targets, implementing criteriaof various KFA at GRT - kaizen, abnormality, suggestions, model area, 5s mega cleaning, audits, etc.
  2. To maintain ISO documentations and fulfil requirements within section. To implement SAP systems at unit for respective area.
  3. WHY-WHY Analysis and, abnormalities data entry in SAP.


KRA 5: Safety
  1. Follow UTCL Safety standards and procedures
  2. Report Near miss cases
  3. Zero Unsafe Activities
  4. Zero Incidents
  5. Walk through Audits
  6. Safety Observations rounds


Critical Job competencies / Mandatory Skills:
  1. Experience of field and desk operating of boilers and turbine during normal and emergency time, safe start-up and stoppage of plant, like to come in round the clock shifts.
  2. Sound knowledge in CFBC and AFBC/WHRS Boilers, Steam turbines, Water chemistry and material handling system (Ash and Coal handling plant) operation. Shift operations through DCS and ensuring field observations & safe controls
  3. Coordination of inter functional activities and collaboration with other functional task for TPP Shift process
  4. Basic knowledge of SAP & TM1 and entry daily power reports in SAP.
  5. Demonstrate the safety and ensuring safety in work place with compliance of organisation's audits and reports.

Ensuring work area basic conditions 5S, Enhance Equipment reliability with OEE and adopting WCM culture/ tools
Professional Experience description: (state key experiences required):
  1. Ensure effective control of plant operating parameters within the control limits with prompt analysis of trends & assignable causes to meet quality requirements of Power Plant operating parameters.
  2. Preparation of annual budget and monitoring the expenditure as per plan
  3. Ensure consistent steam and power output by continually monitoring parameters.
  4. Supervise day to day TPP operation activity and Interact with TPP Maintenance (Mech & EI) department for the day to day operational related activity.
  5. Ensure entry & History in SAP as well as various KPI reports
  6. To ensure full compliance to safety in all respect for all maintenance jobs for all standards by developing and sustaining safety culture at site through various means. To achieve the target of zero harm and injury incident on sustainable basis through effective safety practice and developing environment for the same at workplace
  7. Good coordination shift team members & cross function team members.

8. Ensure consistent steam and power output by continually monitoring parameters.
Professional Qualifications: Diploma/BE/B Tech Mechanical
Essential: Experience in TPP Desk Operation specially with CFBC / WHRS
Preferably: BOE with Energy Manager