Shift Supdt

3 weeks ago


Navi Mumbai, India Reliance Industries Limited Full time

Job Accountabilities -:

  • Ensure the implementation of safety procedures and processes (Workplace safety & Waste management), in the fields
  • Act as Incident command control until arrival of SSM in case of ERCP incidences
  • Monitoring of the consumption of the raw materials and utilities, shift wise
  • Monitor & troubleshoot all process parameters and equipment condition for smooth operation of the plant
  • Effective use of OMPro tool.
  • Ensure compliance to SOP's
  • To lead speedy restart of production after any plant breakdown
  • Reduction of flare loss
  • Highlight exceptions in parameters which affect product quality.
  • Follow up with maintenance departments to expedite planned / unplanned maintenance activities
  • Carry out improvement trials as planned in the plan
  • Identify training and development needs of panel and field operators
  • Coordinate trainings for panel and field operators
  • Share learning from incidents and Root cause analyses
  • Plan OJT for shift staff
  • Highlight exceptions in parameters (both positive and negative)
  • Participate in rack up meetings
  • Maintain shift logs for respective area / equipment
  • Reporting of near-miss incidents
  • Reduce effluent generation
  • Reduction in waste during grade change over in shift
  • Reduction in recycle in shift
  • Reduction HOTO time for maintenance
  • Fulfilment of identified training needs for self


Education Required -:

  • B.E./ B. Tech (Textile) with good and consistent academic records


Experience Required -:

7 to 12 years in any of the above technology


  • Shift Supdt

    2 weeks ago


    Patalganga, Navi Mumbai, Maharashtra, India Reliance Industries Full time

    **Posted Date**: 27 Jun 2024**Function/Business Area**: Manufacturing**Location**: Patalganga**Responsibilities**: - Ensure the implementation of safety procedures and processes (Workplace safety & Waste management), in the fields - Act as Incident command control until arrival of SSM in case of ERCP incidences - Monitoring of the consumption of the raw...